Project Overview

A Danish construction company working on the vessel MPI Resolution asked us to assist with their Pile Gripper system for launching the 300 ton piles off the vessel into the seabed.

The following work was done..

  • We designed a 4 way synchronised lift system to raise and lower the 365 ton pile gripper.
  • The power pack was enclosed in a weatherproof stainless steel cabinet to protect it from the harsh environment.
  • Double acting cylinders with pilot operated check valves fitted, ensured a safe operation.